2 like any other roof project you should start this one by addressing the valleys.
Roll roofing installation step by step.
Use a trowel to scoop up the roofing cement.
Adhere the shingles adjacent to the flange with roofing tar.
Apply roofing cement to the roof.
Roll out and cut roll roofing to cover the length of the roof.
Step by step roll roofing installation 1.
Place the top edge of the roofing along the chalk line.
Install a drip edge around the perimeter of the roof.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
This should give you a 1 inch overhang on the eaves including the top edge of.
To seal a plumbing vent spread roofing.
Plan so that no two butt joints are closer than 2 feet from each other.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
Nail the roofing strips parallel to the roof edge set in 1 and 8 from the roof edge with nails spaced 4 o c.
The line will serve as the guide where the first metal sheet will be installed.
Cut the rolled roofing.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Using a measuring tape measure 35 inches 89 cm up from.
Spread the roofing cement along the.
Mark a chalk line to identify the end of your first layer.
Step 1 draw the base line for you to have a basis on where to proceed with the installation of roof rolls create a line to serve as a mark.
How to do it attach first course.
Cut the shingles to fit around the flange s dome.
Along the eave measure 35 1 2 inches and run the chalk line along this point.
This aluminum flashing protects the edges of the roof sheathing.