For three tab shingles place two quarter size spots of plastic roof cement under the lower corners of each tab as shown in figure 2 7.
Proper roofing procedures.
Take the proper safety precautions.
To create the starter strip first cut off the tabs of the first shingle and discard them.
Start removing the shingles at the peak.
In the same manner you did with the drip mold mark the areas you need to nail with chalk lines.
Rent a trash container.
If there is more than one layer of old shingles or if the single layer is extensively warped or damaged.
Roll out a single layer of roofing.
Space them by 6 inches.
Shingling a roof starts at the roof edge with a starter strip.
Spread the seams of your roofing material across the roof s surface.
Do not base professionalism on the sole criteria of having a legible business card.
For roofing felt synthetic roofs such as epdm tpo and pvc and metal roofs you will need nails to fasten them to your roofs.
Install the ridge cap so the prevailing winds blow over the overlap seams not into them.
Before laying down shingles you need to protect the roof with sheathing.
Snap chalk lines to help keep the row of ridge cap shingles straight.
Drip edge is a.
Ice and water shield installation next step is installing ice and water shield which is a special type of roofing.
Of proper insurance number of references offered proposal provided etc.
Preparing the roof 1.
Proper steps to shingle a house roof preparation.
It s useful to rent a large trash container to throw the old shingles into.
Many roofs are at a high pitch and require roofing jacks to make the job safe.
4 preparing the roof surface for shingles drip edge installation after wood decking is prepared we install drip edge at all edges of the roof.
Once all your shingles are installed you ll need to cover cap the ridge and hip ridges if you have a hip roof.
With laminated shingles place four to six quarter sized dots spaced evenly about one inch above the bottom of the overlapping shingle.