However make sure that you do not nail into the tar strip.
Placing shingles on roof.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Preparing the roof 1.
After completing a column the roofer can go back down to the eave edge of the roof and start laying the next column of shingles.
This saves a lot of time moving shingle bundles and a lot of back strain.
Installing roof shingles in 11 steps.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Not only that the shingles can be piled just to the side of the column being laid.
Pull the drip edge down about a half inch from that line to.
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
See below for a shopping list tools and steps subscr.
Using the chalk line snap a line between the two marks to get a straight edge.
That s also why building codes commonly limit re roofing to no more than two layers.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the.
Remove old shingles and.
Measure the length of a shingle as it lies across the roof.
Starting at the bottom of the roof map out a guideline with chalk.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
What you need power nailer or roofing hatchet tape measure roofing shovel or flat pry bar hammer drill carpenter s square straight cut tin snips utility knife chalkline broom.
Get the right number of shingles for the job.
It generally takes three bundles of shingles to cover 100 square feet.
Lay a starting row at the bottom of the roof along the edge.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.